geoprimsField-grade geospatial math

Lidar bid

Size a lidar job for a bid: the flight lines, the batteries, and the checkpoints the accuracy class needs.

For drone operators and surveyors · 5 steps, worked out together from your values

Planning and education aid. Not for primary navigation. Check every value before you rely on it. Full disclaimer

Your values

Showing an example. Change anything.
Use my drone

Loading…

More options

All 5 steps worked out from your values.

  1. Step 1

    Polygon area and perimeter on the ellipsoid

    The area is 0.299779355 km², with a perimeter of 2.199 km.

    The area and perimeter of the site.

  2. Step 2

    Survey grid (lawnmower pattern)

    Fly 10 lines for 8.85 km and about 154 photos. That takes about 18.4 min.

    Flight lines 60 m apart at 80 m and 8 m/s: path length and flight time.

  3. Step 3

    Battery energy (mAh to Wh)

    The pack holds 313.4 Wh, with 313.4 Wh usable.

    The energy in one battery pack.

  4. Step 4

    Drone flight time

    Hover time is about 16.7 min.

    Flight time per pack at a power draw of 900 W, keeping 20% in reserve.

  5. Step 5

    ASPRS accuracy (Edition 2)

    Vertical accuracy is 4.47 cm RMSE. The checkpoint count meets the Edition 2 minimum of 30.

    The accuracy class your checkpoints support, to the ASPRS standard.

Assumptions (0)

Values this workflow fixes for you. Open the step's tool to change one.