geoprimsField-grade geospatial math

Vertical curve elevations by station

The elevation and grade at each station along a vertical curve, at an interval you choose or at one station, from the to the .

Experimental: not yet fully verified. How results are checked

29+50.00

The curve runs from 29+50.00 to 32+50.00; each row gives the elevation and grade at its station.

Elevations
StationElevationGrade
29+50.00246.800 ft1.200
30+00.00247.250 ft0.600
30+50.00247.400 ft0.000
31+00.00247.250 ft-0.600
31+50.00246.800 ft-1.200
32+00.00246.050 ft-1.800
32+50.00245.000 ft-2.400
PVT station
Provenance
Computed by
survey.curves.vertical-curve-elevations 1.0.0, core 0.1.0
Model
Elevation at x past the PVC = PVC elevation + g1·x + (g2 − g1)·x² / (2L); grade there = g1 + (g2 − g1)·x / L, grades as ratios (Ghilani & Wolf 2021, ch. 25)
Accuracy
Exact for a symmetrical parabolic curve
Notes
1 shown with the answer
Cites
Ghilani, C. D., and Wolf, P. R., Pearson, Elementary Surveying: An Introduction to Geomatics; American Association of State Highway and Transportation Officials, A Policy on Geometric Design of Highways and Streets (the Green Book)

Something look off?

Your values

Showing an example. Change anything.
More options 3
Run many at once from a CSV

Loading…

How we got thisFormula, worked example, sources, and proof

Model: Elevation at x past the PVC = PVC elevation + g1·x + (g2 − g1)·x² / (2L); grade there = g1 + (g2 − g1)·x / L, grades as ratios (Ghilani & Wolf 2021, ch. 25)

Accuracy: Exact for a symmetrical parabolic curve

When to use this: Use this to build the grade sheet for a vertical curve: the design elevation at every station to be staked. Enter the incoming and outgoing grades in percent, the curve length or its K value, and the PVI station and elevation. Set an interval such as 25 or 50 ft, or leave it for every full station, or give one station to get its elevation alone. Each row carries the grade at that station as well.

Limitations: Rows fall on even multiples of the interval, plus the PVC and PVT, so odd stations need the single-station form. A station outside the curve is refused, because it lies on a tangent grade, not on the curve. The curve is an equal-tangent parabola; use the unequal vertical curve tool for an unsymmetrical one. Elevations are design profile grade, not subgrade or ground.

Worked example: A crest from +1.2% to −2.4% over 300 ft, every 50 ft. Source: Arithmetic on the parabola: PVC 29+50 at 246.80 ft, PVT 32+50 at 245.00 ft.

You enter

Incoming grade g1
1.2
Outgoing grade g2
-2.4
Station interval
50 ft
Curve length L
300 ft
PVI elevation
248.60 ft
PVI station
31+00

You get

PVC station
29+50.00
PVT station
32+50.00

Review: Not yet independently reviewed by a licensed surveyor.

Last verified: 2026-09-20, when a maintainer last confirmed this tool's sources at the issuer. See the sources ledger.

Status: version 1.0.0, core 0.1.0. See this tool in the verification report.

Checked against: 24 golden test vectors (download the test vectors, each with its source and tolerance). See how results are checked and every source.

Sources

Terms

PVC: point of vertical curvature
On a vertical curve, where the curve leaves the incoming grade. Source: Elementary Surveying: An Introduction to Geomatics
PVI: point of vertical intersection
On a vertical curve, where the two grade lines would meet. Source: Elementary Surveying: An Introduction to Geomatics
PVT: point of vertical tangency
On a vertical curve, where the curve joins the outgoing grade. Source: Elementary Surveying: An Introduction to Geomatics

Experimental means this tool has not yet met the stable bar: at least 20 golden vectors, differential tests, and an independent worked example.

PVC — point of vertical curvature

On a vertical curve, where the curve leaves the incoming grade.

Source: Elementary Surveying: An Introduction to Geomatics

PVT — point of vertical tangency

On a vertical curve, where the curve joins the outgoing grade.

Source: Elementary Surveying: An Introduction to Geomatics