geoprimsField-grade geospatial math

Deed parser (metes and bounds)

Turns pasted metes-and-bounds deed text into a table of calls (bearings, distances, curves, and monuments) for you to confirm and edit before anything is plotted.

Experimental: not yet fully verified. How results are checked

4

Found 4 calls. Check each one against the deed before plotting.

  • Calls 4 have no bearing and distance (a monument, adjoiner, or natural boundary). They are kept as text; add a bearing and distance or leave the figure open.
Calls
KindDirectionDistanceMonumentSource phraseFlags
lineS 0°15'00" E150 ftUSan iron pinS 00°15'00" E 150.00 feet to an iron pin
lineS 89°45'00" W100 ftUSSouth 89 degrees 45 minutes West 100.00 feet
lineN 0°15'00" W150 ftUSN 0-15-00 W 150.00 feet
non-metricalong the centerline of Mill Creek to the point of beginningNON_METRIC_CALL
Point of beginning
Notice
Provenance
Computed by
survey.land.deed-parse 1.0.0, core 0.1.0
Model
Calls split at each "thence"; quadrant bearings in symbols or words, lengths in feet, chains and links, rods, varas, or meters; curves by radius, arc, delta, chord bearing and chord
Accuracy
A parser, not an interpreter: every call must be confirmed against the deed. Nothing is computed until you confirm the table.
Notes
2 shown with the answer
Cites
Robillard, W. G., and Wilson, D. A., Wiley, Brown's Boundary Control and Legal Principles; Bureau of Land Management, Manual of Surveying Instructions for the Survey of the Public Lands of the United States

Something look off?

Your values

Showing an example. Change anything.
Run many at once from a CSV

Loading…

How we got thisFormula, worked example, sources, and proof

Model: Calls split at each "thence"; quadrant bearings in symbols or words, lengths in feet, chains and links, rods, varas, or meters; curves by radius, arc, delta, chord bearing and chord

Accuracy: A parser, not an interpreter: every call must be confirmed against the deed. Nothing is computed until you confirm the table.

Worked example: A four-call lot. Source: Constructed example exercising symbol, word, and dash bearings and a natural-boundary call (Brown's Boundary Control, ch. 5 call forms).

You enter

Deed text
Beginning at an iron pin at the northeast corner of Lot 7; thence S 00°15'00" E 150.00 feet to an iron pin; thence South 89 degrees 45 minutes West 100.00 feet; thence N 0-15-00 W 150.00 feet; thence along the centerline of Mill Creek to the point of beginning.

You get

Calls
4
Point of beginning
Beginning at an iron pin at the northeast corner of Lot 7
Notice
Parsing and arithmetic aid. Boundary determination requires a licensed surveyor and the governing records.

Review: Not yet independently reviewed by a licensed surveyor.

Last verified: 2026-09-18, when a maintainer last confirmed this tool's sources at the issuer. See the sources ledger.

Status: version 1.0.0, core 0.1.0. See this tool in the verification report.

Checked against: 5 golden test vectors (download the test vectors, each with its source and tolerance). See how results are checked and every source.

Sources

Experimental means this tool has not yet met the stable bar: at least 20 golden vectors, differential tests, and an independent worked example.