Deed parser (metes and bounds)
Turns pasted metes-and-bounds deed text into a table of calls (bearings, distances, curves, and monuments) for you to confirm and edit before anything is plotted.
Experimental: not yet fully verified. How results are checked
Found 4 calls. Check each one against the deed before plotting.
- Calls 4 have no bearing and distance (a monument, adjoiner, or natural boundary). They are kept as text; add a bearing and distance or leave the figure open.
Confirm the parsed calls
Select a source phrase to find its row. Edit any reading that does not match the deed. Calls without geometry stay out of the plot, leaving the figure open.
| Call | Kind | Direction | Distance | Radius | Arc length | Delta | Chord bearing | Chord | Turn | Tangent | Review note |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | an iron pin | ||||||||||
| 2 | Check against the highlighted text. | ||||||||||
| 3 | Check against the highlighted text. | ||||||||||
| 4 | NON_METRIC_CALL |
- Point of beginning
- Notice
Provenance
- Computed by
- survey.land.deed-parse 1.0.0, core 0.1.0
- Model
- Calls split at each "thence"; quadrant bearings in symbols or words, lengths in feet, chains and links, rods, varas, or meters; curves by radius, arc, delta, chord bearing and chord
- Accuracy
- A parser, not an interpreter: every call must be confirmed against the deed. Nothing is computed until you confirm the table.
- Notes
- 2 shown with the answer
- Cites
- Robillard, W. G., and Wilson, D. A., Wiley, Brown's Boundary Control and Legal Principles; Bureau of Land Management, Manual of Surveying Instructions for the Survey of the Public Lands of the United States
Something look off?
How we got thisFormula, worked example, sources, and proof
Model: Calls split at each "thence"; quadrant bearings in symbols or words, lengths in feet, chains and links, rods, varas, or meters; curves by radius, arc, delta, chord bearing and chord
Accuracy: A parser, not an interpreter: every call must be confirmed against the deed. Nothing is computed until you confirm the table.
When to use this: Use this when you have a metes-and-bounds description as text and want its calls in a table instead of retyping them. Paste the deed, and set the jurisdiction if it uses varas or arpents. It splits the text at each thence and lists bearings, distances in US survey feet, curve data, and monuments. You confirm or edit each row, then send the table on to the deed plot.
Limitations: This is a reader, not an interpreter. It can misread odd wording, typos, or unusual units, so check every row against the deed. Calls to a creek, an adjoiner, or a monument with no bearing and distance are kept as text and cannot be plotted. Which call controls when calls conflict is a legal question for a licensed surveyor.
Worked example: A four-call lot. Source: Constructed example exercising symbol, word, and dash bearings and a natural-boundary call (Brown's Boundary Control, ch. 5 call forms).
You enter
- Deed text
- Beginning at an iron pin at the northeast corner of Lot 7; thence S 00°15'00" E 150.00 feet to an iron pin; thence South 89 degrees 45 minutes West 100.00 feet; thence N 0-15-00 W 150.00 feet; thence along the centerline of Mill Creek to the point of beginning.
You get
- Calls
- 4
- Point of beginning
- Beginning at an iron pin at the northeast corner of Lot 7
- Notice
- Parsing and arithmetic aid. Boundary determination requires a licensed surveyor and the governing records.
Review: Not yet independently reviewed by a licensed surveyor.
Last verified: 2026-09-18, when a maintainer last confirmed this tool's sources at the issuer. See the sources ledger.
Status: version 1.0.0, core 0.1.0. See this tool in the verification report.
Checked against: 5 golden test vectors (download the test vectors, each with its source and tolerance). See how results are checked and every source.
Sources
- Brown's Boundary Control and Legal Principles, Robillard, W. G., and Wilson, D. A., Wiley, 7th edition. Chapter 5 (metes-and-bounds descriptions, calls, and the order of importance of conflicting elements). Read free.
- Manual of Surveying Instructions for the Survey of the Public Lands of the United States, Bureau of Land Management, 2009 Manual. Chapter 1 (units: chain of 66 feet, link of 0.66 feet) and Chapter 3 (subdivision of sections, aliquot parts).
Experimental means this tool has not yet met the stable bar: at least 20 golden vectors, differential tests, and an independent worked example.