Four-point average cut and fill
Cut and fill volumes over a grid, cell by cell: each cell's four corner depths averaged over its area, with cells that cross from cut to fill split between the two.
Experimental: not yet fully verified. How results are checked
The grid has 117.88 m³ of cut and 62.88 m³ of fill, a net of 55 m³.
| East | South |
|---|---|
| 27.500 m | 0.000 m |
| 20.000 m | 7.500 m |
| 17.500 m | 10.000 m |
| 10.000 m | 17.500 m |
| 7.500 m | 20.000 m |
- Fill volume (four-point)
- Net volume (corner weights)
- Net volume, cubic yards
Provenance
- Computed by
- survey.earthwork.four-point-average 1.0.0, core 0.1.0
- Model
- Per cell, volume = cell area × (h₁ + h₂ + h₃ + h₄) / 4 with h the existing less the proposed elevation at each corner; a cell with cut and fill corners is split as cut = A·P² / (4(P + N)) and fill = A·N² / (4(P + N)), P and N the sums of its cut and fill depths (Ghilani & Wolf 2021, ch. 26)
- Accuracy
- Exact for ground that is straight between grid points; a finer grid follows rough ground more closely
- Notes
- 1 shown with the answer
- Cites
- Ghilani, C. D., and Wolf, P. R., Pearson, Elementary Surveying: An Introduction to Geomatics
Something look off?
How we got thisFormula, worked example, sources, and proof
Model: Per cell, volume = cell area × (h₁ + h₂ + h₃ + h₄) / 4 with h the existing less the proposed elevation at each corner; a cell with cut and fill corners is split as cut = A·P² / (4(P + N)) and fill = A·N² / (4(P + N)), P and N the sums of its cut and fill depths (Ghilani & Wolf 2021, ch. 26)
Accuracy: Exact for ground that is straight between grid points; a finer grid follows rough ground more closely
When to use this: Use this for a site-grading takeoff where cut and fill both matter, such as a building pad or a parking lot. Enter the existing elevations on a square grid, the cell size, and either one finished grade or a proposed elevation at each grid point. The tool returns the cut and the fill separately, the net of the two, and the points where the balance line between them crosses the grid.
Limitations: The ground is treated as straight between grid points, so ridges, ditches, and breaks inside a cell are missed. Cells must be square and the same size, and every row needs the same number of points. A cell that crosses from cut to fill is split by depth, which is an approximation of where the line runs. Volumes are bank measure before any swell or shrink.
Worked example: A 3 × 4 grid at 10 m graded to a sloping pad. Source: add-survey-suite grid method requirement, four-point arithmetic. It is golden test vector v001, and every build checks the tool still gives its answer within its tolerance.
You enter
- Cell size
- 10 m
- Existing elevations
- 52.4, 52.1, 51.7, 51.2 52.0, 51.6, 51.1, 50.7 51.5, 51.0, 50.6, 50.1
- Proposed elevations
- 51.6, 51.5, 51.4, 51.3 51.4, 51.3, 51.2, 51.1 51.2, 51.1, 51.0, 50.9
You get
- Cut volume (four-point)
- 117.88 m³
- Fill volume (four-point)
- 62.88 m³
- Net volume (corner weights)
- 55 m³
- Net volume, cubic yards
- 71.94 yd³
Review: Not yet independently reviewed by a licensed surveyor.
Last verified: 2026-09-23, when a maintainer last confirmed this tool's sources at the issuer. See the sources ledger.
Status: version 1.0.0, core 0.1.0. See this tool in the verification report.
Checked against: 23 golden test vectors (download the test vectors, each with its source and tolerance). See how results are checked and every source.
Sources
- Elementary Surveying: An Introduction to Geomatics, Ghilani, C. D., and Wolf, P. R., Pearson, 16th edition. Chapter 26 (volumes: unit-area or borrow-pit method).
Experimental means this tool has not yet met the stable bar: at least 20 golden vectors, differential tests, and an independent worked example.