Four-point average cut and fill

Cut and fill volumes over a grid, cell by cell: each cell's four corner depths averaged over its area, with cells that cross from cut to fill split between the two.

Experimental: not yet fully verified. How results are checked

117.88m³

The grid has 117.88 m³ of cut and 62.88 m³ of fill, a net of 55 m³.

Balance line
EastSouth
27.500 m0.000 m
20.000 m7.500 m
17.500 m10.000 m
10.000 m17.500 m
7.500 m20.000 m
Fill volume (four-point)
Net volume (corner weights)
Net volume, cubic yards
Provenance
Computed by
survey.earthwork.four-point-average 1.0.0, core 0.1.0
Model
Per cell, volume = cell area × (h₁ + h₂ + h₃ + h₄) / 4 with h the existing less the proposed elevation at each corner; a cell with cut and fill corners is split as cut = A·P² / (4(P + N)) and fill = A·N² / (4(P + N)), P and N the sums of its cut and fill depths (Ghilani & Wolf 2021, ch. 26)
Accuracy
Exact for ground that is straight between grid points; a finer grid follows rough ground more closely
Notes
1 shown with the answer
Cites
Ghilani, C. D., and Wolf, P. R., Pearson, Elementary Surveying: An Introduction to Geomatics

Something look off?

Your values

Showing an example. Change anything.
More options 1
Run many at once from a CSV

Loading…

How we got thisFormula, worked example, sources, and proof

Model: Per cell, volume = cell area × (h₁ + h₂ + h₃ + h₄) / 4 with h the existing less the proposed elevation at each corner; a cell with cut and fill corners is split as cut = A·P² / (4(P + N)) and fill = A·N² / (4(P + N)), P and N the sums of its cut and fill depths (Ghilani & Wolf 2021, ch. 26)

Accuracy: Exact for ground that is straight between grid points; a finer grid follows rough ground more closely

When to use this: Use this for a site-grading takeoff where cut and fill both matter, such as a building pad or a parking lot. Enter the existing elevations on a square grid, the cell size, and either one finished grade or a proposed elevation at each grid point. The tool returns the cut and the fill separately, the net of the two, and the points where the balance line between them crosses the grid.

Limitations: The ground is treated as straight between grid points, so ridges, ditches, and breaks inside a cell are missed. Cells must be square and the same size, and every row needs the same number of points. A cell that crosses from cut to fill is split by depth, which is an approximation of where the line runs. Volumes are bank measure before any swell or shrink.

Worked example: A 3 × 4 grid at 10 m graded to a sloping pad. Source: add-survey-suite grid method requirement, four-point arithmetic. It is golden test vector v001, and every build checks the tool still gives its answer within its tolerance.

You enter

Cell size
10 m
Existing elevations
52.4, 52.1, 51.7, 51.2 52.0, 51.6, 51.1, 50.7 51.5, 51.0, 50.6, 50.1
Proposed elevations
51.6, 51.5, 51.4, 51.3 51.4, 51.3, 51.2, 51.1 51.2, 51.1, 51.0, 50.9

You get

Cut volume (four-point)
117.88 m³
Fill volume (four-point)
62.88 m³
Net volume (corner weights)
55 m³
Net volume, cubic yards
71.94 yd³

Review: Not yet independently reviewed by a licensed surveyor.

Last verified: 2026-09-23, when a maintainer last confirmed this tool's sources at the issuer. See the sources ledger.

Status: version 1.0.0, core 0.1.0. See this tool in the verification report.

Checked against: 23 golden test vectors (download the test vectors, each with its source and tolerance). See how results are checked and every source.

Sources

Experimental means this tool has not yet met the stable bar: at least 20 golden vectors, differential tests, and an independent worked example.