Point from station and offset
Computes plane coordinates at a station and signed offset from a straight alignment.
The station-offset point is northing 5,185.825 ft, easting 5,296.859 ft (left).
- Offset
- Side
- Foot of the perpendicular, northing
- Foot of the perpendicular, easting
- Point northing
- Point easting
Provenance
- Computed by
- survey.cogo.point-from-station-offset 1.0.0, core 0.1.0
- Model
- Plane tangent setout: P = S + along·t + offset·n, with along = target station − start station and n to the right (Ghilani & Wolf 2021, ch. 11)
- Accuracy
- Exact
- Notes
- None
- Cites
- Ghilani, C. D., and Wolf, P. R., Pearson, Elementary Surveying: An Introduction to Geomatics
Something look off?
How we got thisFormula, worked example, sources, and proof
Model: Plane tangent setout: P = S + along·t + offset·n, with along = target station − start station and n to the right (Ghilani & Wolf 2021, ch. 11)
Accuracy: Exact
When to use this: Use this to compute the coordinate of a stakeout or design point described by station and offset from a straight centerline or baseline. Define the line from its start and a bearing or second point, state the starting station, then enter the target station and signed offset. Positive offsets are right and negative offsets are left while facing ahead on stationing.
Limitations: The calculation extends one straight line without clipping to a supplied end point. It does not place points along circular curves, spirals, or a full route alignment. All coordinates and offsets must use compatible plane units, and the station notation must match the project's metric or US stationing convention. Check the sign convention before staking the result. A zero offset places the point on the centerline itself, and the side then reads as on the line.
Worked example: Point 12.5 ft left at station 13+50. Source: add-survey-suite station-offset geometry. It is golden test vector v001, and every build checks the tool still gives its answer within its tolerance.
You enter
- Line direction
- 60
- Offset
- -12.5 ft
- Line start easting
- 5000 ft
- Line start northing
- 5000 ft
- Start station
- 10+00
- Station
- 13+50
You get
- Station
- 13+50.00
- Offset
- -12.5 ft
- Side
- left
- Foot of the perpendicular, northing
- 5,175 ft
- Foot of the perpendicular, easting
- 5,303.109 ft
- Point northing
- 5,185.825 ft
- Point easting
- 5,296.859 ft
Review: Not yet independently reviewed by a licensed surveyor.
Last verified: 2026-09-23, when a maintainer last confirmed this tool's sources at the issuer. See the sources ledger.
Status: version 1.0.0, core 0.1.0. See this tool in the verification report.
Changes
- 2026-10-19, changed: Station and offset from a line, with its two focused views (perpendicular foot and point from station and offset), is now stable. All three are held to the Autodesk Civil 3D station-and-offset example, with 16 new vectors and a new invariant test. Results are unchanged. Changelog
Checked against: 25 golden test vectors (download the test vectors, each with its source and tolerance). See how results are checked and every source.
Sources
- Elementary Surveying: An Introduction to Geomatics, Ghilani, C. D., and Wolf, P. R., Pearson, 16th edition. Chapter 11 (coordinate geometry: perpendicular distance and station-offset).