Under-keel clearance with squat
What is left under the keel from the charted depth, the tide, the draft, a squat estimate by Barrass's formula, and the margin you set, with every term of the stack shown.
Planning and education aid. Not for primary navigation. Full disclaimer
Experimental: not yet fully verified. How results are checked
That leaves 2.1 m of water under the keel, 1.1 m more than your margin.
- Water under the keel
- Clearance after your margin, in feet
- Squat
- Where she squats
- Water depth
- Draft with squat
Provenance
- Computed by
- navigation.vessel.under-keel-clearance 1.0.0, core 0.1.0
- Model
- Clearance = charted depth + tide − (draft + squat + margin). Squat by Barrass: S_max = K C_B V_K² / 100 with V_K in knots, K = 5.74 S^0.76 for a blockage factor S (K = 1 in open water, K ≈ 2 in a confined channel at S = 0.25), and the other end of the ship at [1 − 40(0.7 − C_B)²] S_max, the bow above C_B 0.7 and the stern below it
- Accuracy
- The arithmetic of the stack is exact in the units you give. Squat is an estimate from a regression on more than 600 model and ship measurements: published comparisons put Barrass above most other formulas for the same ship, by about a tenth of a meter at 8 knots on a 7,800 tdw cargo ship, so it is the cautious one of the set rather than the closest
- Notes
- 1 shown with the answer
- Cites
- "Mircea cel Batran" Naval Academy Scientific Bulletin (Constanta), Deleanu and Panaitescu, Comparison between formulas of maximum ship squat; National Geospatial-Intelligence Agency, The American Practical Navigator (Bowditch), NGA Pub. No. 9, Volume I
Something look off?
How we got thisFormula, worked example, sources, and proof
Model: Clearance = charted depth + tide − (draft + squat + margin). Squat by Barrass: S_max = K C_B V_K² / 100 with V_K in knots, K = 5.74 S^0.76 for a blockage factor S (K = 1 in open water, K ≈ 2 in a confined channel at S = 0.25), and the other end of the ship at [1 − 40(0.7 − C_B)²] S_max, the bow above C_B 0.7 and the stern below it
Show your work
Water over the datum
Charted depth + tide12.00 m + 1.50 m= 13.50 mWhat the ship draws
10.80 m + 0.60 m= 11.40 mClearance after the margin
13.50 m − 11.40 m − 1.00 m= 1.1 m
The same steps an agent gets from the MCP server with explain: true.
Accuracy: The arithmetic of the stack is exact in the units you give. Squat is an estimate from a regression on more than 600 model and ship measurements: published comparisons put Barrass above most other formulas for the same ship, by about a tenth of a meter at 8 knots on a 7,800 tdw cargo ship, so it is the cautious one of the set rather than the closest
When to use this: Use this when you plan a passage over a bar, a dredged channel, or any shoal patch and want the terms of under-keel clearance written out: the charted depth, the tide you expect at the time, your static draft, a squat estimate for the speed you intend, and the margin you or the port require. Send the tide height over from the tide prediction for the arrival hour. It shows the whole stack rather than one number, so you can see which term to change.
Limitations: Squat is an estimate, not a measurement, and Barrass's formula is published for block coefficients from 0.5 to 0.85 and depth-to-draft ratios from 1.1 to 1.4, with blockage factors from 0.10 to 0.25; outside those the tool refuses rather than extrapolate. It knows nothing of heel, list, trim, sea state, swell, density, or the state of the dredge, and the charted depth is the chart's, not today's. The margin is yours: the master and the port authority decide what is acceptable, and nothing here is a permission to proceed.
Worked example: A 12.0 m channel, 1.5 m of tide, 10.8 m draft, 0.6 m of squat, 1.0 m margin. Source: add-marine-navigation navigation/under-keel-clearance, the Stack scenario: 2.1 m of water under the keel and 1.1 m left after the margin. It is golden test vector v001, and every build checks the tool still gives its answer within its tolerance.
You enter
- Charted depth
- 12.0 m
- Static draft
- 10.8 m
- Your margin
- 1.0 m
- Squat
- 0.6 m
- Tide height
- 1.5 m
You get
- Clearance after your margin
- 1.1 m
- Water under the keel
- 2.1 m
- Clearance after your margin, in feet
- 3.6 ft
- Squat
- 0.6 m
- Where she squats
- as you gave it
- Water depth
- 13.5 m
- Draft with squat
- 11.4 m
- Depth-to-draft ratio
- 1.25
- The stack
- charted depth 12.00 + tide 1.50 − draft 10.80 − squat 0.60 − margin 1.00 = 1.10 (m, your own squat)
- Who decides
- The master and the port authority decide what clearance is acceptable; this is arithmetic, not permission.
Review: Not yet independently reviewed by a geodesist.
Last verified: 2026-09-19, when a maintainer last confirmed this tool's sources at the issuer. See the sources ledger.
Status: version 1.0.0, core 0.1.0. See this tool in the verification report.
Changes
- 2026-11-06, added: A new tool works out under-keel clearance. You give the charted depth, the tide you expect at the hour you pass, your static draft, and the margin you or the port require, and it writes the stack out: the water over the datum, what the ship draws once squat is added, what is left under the keel, and what is left after the margin, in meters and feet, with a drawing of the stack to scale. Squat is estimated by Barrass's formula for the speed you intend, in open water, a confined channel, or from a blockage factor you work out, and the tool refuses outside the block coefficients and depth-to-draft ratios that formula is published for rather than extrapolating. You can give a squat figure of your own instead. The result never calls a clearance safe: it reports the numbers, and says that the master and the port authority decide. The tool is experimental, because the one published worked example found for Barrass's formula does not follow its own printed equations. Changelog
Checked against: 24 golden test vectors (download the test vectors, each with its source and tolerance). See how results are checked and every source.
Sources
- Comparison between formulas of maximum ship squat, "Mircea cel Batran" Naval Academy Scientific Bulletin (Constanta), Deleanu and Panaitescu, Volume XIX, Issue 1, pp. 105-111 (DOI 10.21279/1454-864X-16-I1-018, CC BY-NC-SA 4.0). Table 1 (channel configurations and parameter constraints: Barrass, C_B 0.5 to 0.85, h/T 1.1 to 1.4), equations (2) and (3) (S_max = K C_B V_K^2 / 100, K = 5.74 S^0.76, with 0.10 <= S <= 0.25), and equation (4) (the other end of the ship).
- The American Practical Navigator (Bowditch), NGA Pub. No. 9, Volume I, National Geospatial-Intelligence Agency, 2024 edition. Chapter 9, Shiphandling in shallow water: squat, its growth with the square of the speed, and under-keel clearance as the master's judgment.
Experimental means this tool has not yet met the stable bar: at least 20 golden vectors, differential tests, and an independent worked example.