Transform between reference frames
Moves a position between ITRF, WGS 84, and NAD 83 realizations at one epoch along the chain of published transformations with the least combined uncertainty, and lists each step with its accuracy.
The point moves 1.3621 m and is good to about 0.028 m.
- "WGS 84" names several realizations; the source frame was taken as the current one, WGS 84 (G2296).
| From | To | Method | Accuracy |
|---|---|---|---|
| WGS84(G2296) | ITRF2020 | WGS 84 aligned with the ITRF (no change) | 0.020 m |
| ITRF2020 | NAD83(2011) | NGS HTDP 3.6.0 14-parameter transformation | 0.020 m |
- Longitude
- Ellipsoidal height
- Horizontal shift
- Path accuracy
Provenance
- Computed by
- geodesy.datum.transform 1.0.0, core 0.1.0
- Model
- A graph of frames joined by published transformations: IERS 14-parameter sets through ITRF2020, WGS 84 realizations aligned with their ITRFs, and the NGS HTDP 3.6.0 sets for NAD 83; the path with the least accumulated variance is taken, and its steps' uncertainties are combined by root sum of squares
- Accuracy
- About 2.8 cm (1σ), the root sum of squares of the 2 steps' stated uncertainties; the coordinates' own accuracy is not included.
- Notes
- 1 shown with the answer
- Cites
- IERS ITRF Center, IGN France, ITRF2020: transformation parameters from ITRF2020 to past ITRFs; National Geodetic Survey, NOAA, Horizontal Time-Dependent Positioning (HTDP) software, version 3.6.0; National Geospatial-Intelligence Agency, Department of Defense World Geodetic System 1984, NGA.STND.0036
Something look off?
How we got thisFormula, worked example, sources, and proof
Model: A graph of frames joined by published transformations: IERS 14-parameter sets through ITRF2020, WGS 84 realizations aligned with their ITRFs, and the NGS HTDP 3.6.0 sets for NAD 83; the path with the least accumulated variance is taken, and its steps' uncertainties are combined by root sum of squares
Accuracy: Each step is exact to its published parameters (matching HTDP within 1 mm and the IERS values); the path's stated accuracy combines the steps' stated uncertainties
When to use this: Use this when a position must move between two named frames and you want the tool, not you, to find the chain: WGS 84 from a GPS receiver to NAD 83 (2011) for a US survey, ITRF2014 to ITRF2020 for a processed solution, or NAD 83 (PA11) to WGS 84 in Hawaii. It names each step and how good it is, so the answer carries its own error budget.
Limitations: The frames here are the modern ITRF, WGS 84, and NAD 83 realizations. NAD 27 and the older NAD 83 realizations need the NADCON5 grids and are in the NADCON5 tool, and a legacy datum such as ED50 is in the legacy-datum tool. The epoch is required and is not guessed from the date. The transformation changes the frame, not the epoch: a position's own motion over time is the plate-motion tool. The stated accuracy is the transformations', not the coordinates'.
Worked example: A GPS position in Kansas to NAD 83. Source: add-geodesy-suite scenario: an unqualified WGS 84 is taken as G2296 with REALIZATION_ASSUMED; the step itself matches NGS HTDP 3.6.0 within 1 mm (geodesy.datum.nad83's golden vectors). It is golden test vector v001, and every build checks the tool still gives its answer within its tolerance.
You enter
- Epoch
- 2026.5
- From frame
- WGS84
- Ellipsoidal height
- 400 m
- Latitude
- 39 deg
- Longitude
- -98 deg
- To frame
- NAD83(2011)
You get
- Latitude
- 38.999994268°
- Longitude
- -97.9999861°
- Ellipsoidal height
- 401.0101 m
- Horizontal shift
- 1.3621 m
- Path accuracy
- 0.028 m
Review: Not yet independently reviewed by a geodesist.
Last verified: 2026-09-19, when a maintainer last confirmed this tool's sources at the issuer. See the sources ledger.
Status: version 1.0.0, core 0.1.0. See this tool in the verification report.
Changes
- 2026-09-24, added: A new stable tool moves a position between any two ITRF, WGS 84, and NAD 83 realizations at one epoch. It finds the chain of published transformations with the least combined uncertainty (IERS, NGA's WGS 84 alignment, and NGS HTDP) and lists each step with its accuracy and the combined total. Its steps match NGS HTDP within a millimeter and PROJ's IERS parameters. Changelog
Checked against: 43 golden test vectors (download the test vectors, each with its source and tolerance). See how results are checked and every source.
Sources
- ITRF2020: transformation parameters from ITRF2020 to past ITRFs, IERS ITRF Center, IGN France, Transfo-ITRF2020_TRFs.txt. Parameters at epoch 2015.0 with rates, position-vector convention (formula 1).
- Horizontal Time-Dependent Positioning (HTDP) software, version 3.6.0, National Geodetic Survey, NOAA, HTDP 3.6.0 (2025-04-07). Subroutine SETTP: transformation parameters from ITRF94 to NAD 83 and the ITRF and WGS 84 realizations.
- Department of Defense World Geodetic System 1984, NGA.STND.0036, National Geospatial-Intelligence Agency, NGA.STND.0036_1.0.0_WGS84. Chapter 2: realizations of WGS 84 and their alignment with the ITRF.